Summer 2007 - The repaired/rebuilt and new windows were put in and the front porch area and roof line facia were repaired, prepped and painted.
![]() |
![]() |
![]() |
Fall 2006 - With the extensive damage to the south wall repaired and new clapboards put on, the finish work began. Windows that had been repaired were reinstalled in the front of the house and in the upper floor on the ell section. Campion Painting did a wonderful job of prepping, priming and painting the south wall, front sw corner and a good start on the back main part of the house.
![]() |
![]() |
![]() |
Spring/Summer 2006 -
![]() Exterior south wall repaired, rebuilt and clapboards being replaced. |
![]() Exterior south west corner under repair. |
![]() Exterior south wall stripped, showing damage and rot. |
![]() Exterior south wall upper floor window stripped, showing damage and rot. |
![]() Work getting underway to repair damge to South wall |
Winter / Spring, 2006 -
![]() New support beam in ell section |
Ongoing work over the winter and into spring included...
|
Summer / Fall, 2005 -
![]() Exterior back wall with new door to access bathroom area |
![]() Interior new framing and floor in what will be bathrooms. |
![]() Interior, looking through wall into bathroom area and out doorway |
Summer / Fall, 2004 -
![]() Exterior back wall with new bulkhead and clapboards |
![]() Interior with new joists, framing and door. |
![]() Interior, new stairs to 3rd floor, framing and window openings. |
September, 2003 -
![]() Front of house showing the recently painted section above the porch roof. |
![]() Interior of "ell" rebuilt repaired and rebuilt, new walls, floor section and window framing. |
![]() Rear section of the "ell" rebuilt and clapboards replaced & painted. New back door, floor boards in sections of the ell. |
April, 2003 -
![]() Front deck floor finished, corner sills rebuilt and clapboards replaced. Windows have temporary plexi-glass to allow light in but keep weather out. |
![]() Rear section of the "ell" rebuilt and clapboards replaced. New back door, floor boards in sections of the ell. |
July, 2002 - Work on the "ell" section
![]() New exterior wall boards going up on the ell. Interior rock foundation and sills exposed >> |
![]() |
![]() |
June 9, 2001 - August 1, 2001
![]() |
At left,
the front porch was removed and the new framing begun on June 9,
2001.
At
right, the new mahogany decking is almost complete as the rebuild
of the front porch continues. |
![]() |
|
May 29, 2001 - Major structural work was completed over the winter in the interior, fire damaged areas. The second floor front facade was rebuilt, along with corner boards and sills. The new shingles are on and we are ready for the FRONT PORCH! |
![]() |
|
|
June 21, 2000 - The repairs to the front, main roof completed -the shingles are being put on! |
June 20, 2000 - The shingles and roofing materials donated by JT's of Middletown are delivered and the new roof begins to take shape.
![]() |
![]() |
March 25, 2000 - An open house was held to show progress made so far and invite the community to come see. In case you didn't make it here are a few photos.
![]() L to R- Gerry Leis (born in house), Barbara Taylor Renza (Grandparents - Mr. & Mrs. Moses Taylor - owned house), Mary Lou Lemieux (lived in house, wedding reception in back yard) |
![]() The main front roof is stripped, ready for new shingles! |
![]() Upstairs, north to south view |
![]() Upstairs, south to north view |
January - February, 2000

Front of house in January 2000
|
|
|
Photos - from clean up day in December 1999
Interior:

Exterior:
| Funding & Construction | |||
| Photos Map/Directions |
News and Updates | How can YOU Help? | Sponsors/Gifts/Grants |
| HOME | History/Stories | Past Events |